Tuesday, April 6, 2010

I am Lazy

Matt spent two days grinding off the neven surfaces and beveling the portlight openings to prepare them to be glassed over.  This apparently resulted in such a cloud of dangerous particles of fiberglass flying around that we needed to upgrade the shopvac and put a filter on the fan that ventilates the tarp enclosure. So sad I missed all that.

Structural fairing compound goes up right onto the lexan windows we installed last year.

Meanwhile, my job is to clean the adhesive and paper off of the bowmar windows we bought at Bacon's, which allows me to stay home and not in all the fiberglass. Sweet. Also, I made a cover for the tiller. I think the diligence score looks something like this: Matt: 400,000 Carrie:  2


No comments:

Post a Comment